Projects
Optimal working from registrations to reports for project teams in the infra and manufacturing industry
Own working method
All devices

These organizations rely on KE-chain










Optimal working from registration to reporting for project teams
Optimal working from registrations to reports for project teams. Use the forms for quality assurance, project control, compliance or systems engineering. With the flexible set-up you can transfer all forms 1-to-1 digitally to KE-chain.
All types of registrations, with your own forms, working methods and calculations in one form. Record everything, including text, photos, measurement attachments, locations and signatures. Digitalization of the own work processes is possible with the forms and workflow building blocks of the platform. With the separate script environment you can manage, update, link and use all calculations.
All forms can always be exported to PDF, including attachments, or shared directly via email. Of course you can also easily export multiple forms together to a ZIP. With the powerful API you can also easily create overviews and dashboards of your forms.

Features

In control
With KE-chain you are able to arrange everything the way you want it. Set everything up the way you're used to.

Register everything
Record everything you want. Text, photos, selections, documents, date, location, QR code, signature and more

Digital collaboration
A place for the whole team to work together from registrations to reports. Watching AND working together.

Report directly
With the press of a button your form is translated into a digital report including all attachments in a PDF.

Own forms
With the flexible set-up you can digitally transfer your own forms 1-to-1 to KE-chain.

Digital projects
Each project has its own environment with its own forms, templates, periods, locations, objects, etc.
What our users say

The location capture and automatically generated project reporting are a great success

A place for the excavation chain to cooperate digitally in the prevention of excavation damage
With the KE-chain link it is now possible to automate that entire process.

With KE-chain we have insight and control over the primary construction process of our design and construct projects
Want to learn more?
Give me a call or schedule an appointment directly in my calendar here.